News
- All
- Green Build
- Training
- Roofing
- Housing
- Projects
- Technology
- People
- Legal
- Events
- Security
- Plant
- Blog
- Products
- Waste
- News
- Jobs
Institution of Civil Engineers Written Assignment & the Attributes
An intensive preparatory course for the ICE Chartered Reviews (For IEng MICE/MICE/AMICE - See ICE Written Test course outline) Testimonials from delegates on previous courses: "The content and style of presentation for both courses were very well
Read more: Institution of Civil Engineers Written Assignment & the Attributes
Londoners may call out plumbers for variety of reasons
Most people will call out an emergency plumber when they have some form of urgent problem relating to their water or heating supply.Such tradesmen are trained to be able to deal with a huge range of issues that your average homeowner is not going to have a clue how to fix.Naturally, when it comes to the nuts and bolts of keeping water running around the house, you need to be able to call a professional you can trust - or face a few days without showering at home.
Read more: Londoners may call out plumbers for variety of reasons
Security on construction sites
Protecting construction sites from arson, theft, and ensuring the safety of workers and members of the public should be a priority among duty holders. The risk of having poor security measures on construction sites can result in serious injury or even, fatalities to workers or visitors. But there are also other considerations. Serious fires can ravage buildings, injuries can bring litigation cases and theft of expensive equipment can prove a costly headache for firms. Making sure the construction site has the right insurance is essential.
Officials mark start of SDS construction
A throng of public officials from Pueblo and El Paso counties ushered in the Southern Delivery System on Friday at the face of Pueblo Dam. “This is a recognition of the hard work that has gotten us to this point in construction,” said Gary Bostrom, chief water services officer for Colorado Springs Utilities, and the longtime former manager of the SDS project. “We’re just starting and we still have a lot of work to do.”
Building A Pipeline, Creating A Lifeline
History was made at the Pueblo Dam Friday as officials kick off one of the largest water supply projects in Colorado. It’s something that has been 20 years in the making, and one that will impact lives for decades into the future.
Storm Water issues still dog SDS Pipeline project
PUEBLO — Colorado Springs Utilities has overcome major obstacles over nearly two decades to move the Southern Delivery System from a plan on paper to a pipeline in the ground.
Read more: Storm Water issues still dog SDS Pipeline project
Southern Delivery System backers celebrate
DENVER (AP) - Officials in four towns are celebrating the start of construction on 1 of the largest water projects in Colorado in years.
Construction Site Security Guards
A nationwide company with offices in Aberdeen - Glasgow - Leeds - Manchester - Liverpool - Coventry - Oxford - London - Southampton and Belfast (Northern Ireland).
Construction 2.0: Run Without PCs
Silicon Valley Builders Group arms its highly mobile team with smartphones and tablets for real-time productivity and collaboration. Check out the business case for leaving the PC behind.
New Construction Management module available
The whole construction process can be managed in Tekla. There is a new Construction Management module available starting from July 2011 that can be added on to an existing Tekla Structures 17 software configuration. With the module, it is possible to add construction management functionality on top of an existing Tekla Structures 17 configuration to model and manage in the same package. For example to:
Direct software link between Tekla and Maruhide Koki Pipe Coaster
Tekla and Maruhide Koki provide an application called PIPELABO to create a direct link between Tekla 3D BIM software and Maruhide Koki's Pipe Coaster HID Series machinery.
With an application called PIPELABO, the 3D building information modelling (BIM) data of round and square steel pipes designed in Tekla Structures software can be automatically transformed into pipe cutting data for Maruhide's Pipe Coaster machines. This enables labor and cost savings and prevents incorrect data at data entry. The solution has been available as of July 1, 2011.
Read more: Direct software link between Tekla and Maruhide Koki Pipe Coaster
